EEC-SCEEC-SCEEC-SCEEC-SC
  • HOME
  • PRODUCTS
    • IBS ERP Solution
    • IBSBOX
  • SERVICES
    • DIGITIZATION
    • ENVIRONMENT
  • PROJECTS
  • ABOUT IBS
    • IBS Overview
    • IBS Profile
    • CONTACT
✕

EEC-SC

  • Home
  • Our Projects
  • Smart Environment
  • EEC-SC

Warning: Attempt to read property "post_excerpt" on null in /var/www/html/ibsolutions.me/wp-content/themes/betheme/includes/content-single-portfolio.php on line 196
  • Location: King Abdullah Economic City – Rabhigh, KSA
  • Developer: Emaar, The Economic City
  • Duration: 12 Months

 


Scope of Work:

  • Defined ISP/OSP guidelines to comply with both international standards and SAGIA requirements.
  • Worked with Orange on Business Modeling and Operating Strategy for Technology smart city part within the city.
  • Worked directly with Cisco and Ericsson on Optimal Networking & Smart Environment infrastructure design (FTTH, NOC, NMS, O&M, etc).
  • Worked with EEC-SC to define services & packaging of smart city functionalities & features (e.g. Triple play, BMS, BAS, etc.
  • Introduced a prototype for Customer Relation Management (CRM) model.

شركة أعمال الإبداع

Al Bassam Business Center, Office 51. Western Baghdadiya, Ibrahim Shakir St. P.O.Box: 54000. Jeddah, Saudi Arabia. Phone: +966 12 642 0222 Fax: +966 12 642 0333 Email: info@ibsolutions.me

اتصل بنا

    زورونا


    Warning: Trying to access array offset on value of type bool in /var/www/html/ibsolutions.me/wp-content/themes/betheme/functions/plugins/visual-composer.php on line 19

    Warning: Trying to access array offset on value of type bool in /var/www/html/ibsolutions.me/wp-content/themes/betheme/functions/plugins/visual-composer.php on line 19
    EEC-SC
    Show Map

    © 2020 Innovative Business Solutions | IBS. All Rights Reserved.